Three House Pictures

October 30, 2006

This is the manifold for connecting the radiant heat to a future boiler.  There are four circuits.

A bump out into the garage was added to accommodate an upright freezer in the pantry.  Note also that doors were installed today. These are the final jambs, but the doors themselves are construction doors that will be replaced when the house nears completion.

 Additional framing work today included framing the front pillars, pictured below, framing the ceiling in the lower level hallway for the lowered ceiling covering the ductwork, and adding a doorway under the lower level stairs for an additional closet.

Previous day.

Next day.

Three House Pictures Index

Norman C. Witte Personal Web Page Command Center